Commissioning of the 11.6 kW Hybrid Solar System in Binh My, Cu Chi: A Testament to Professionalism and Team Unity

Executive Summary

The 11.6 kW hybrid solar system with integrated battery storage has been successfully installed and commissioned by Thinh Phong in Binh My, Cu Chi. This project represents not only a strategic clean energy solution but also the result of meticulous planning, strong teamwork, and dedicated leadership from Director Pham Hoang Hanh Nhan.


Caption: Overview of the fully installed 11.6 kW system featuring the Goodwe hybrid inverter and LITHIUM VALLEY storage battery, professionally arranged and ready for operation.


Project Overview

The system utilizes high-quality components, including the GoodWe hybrid inverter and LITHIUM VALLEY storage batteries, to ensure intelligent, stable, and efficient operation.

Key benefits of the system include:

  • Maximized self-consumption: Solar energy is prioritized for household loads to reduce dependency on the national grid.

  • Enhanced energy security: The LITHIUM VALLEY battery functions as a whole-house UPS, keeping critical devices operational during power outages.

  • Long-term cost savings: Smart charge/discharge control reduces monthly electricity bills while promoting sustainable energy use.


Caption: The system operates smoothly, with solar energy efficiently charging the LITHIUM VALLEY batteries, ensuring power is always available for household consumption.


Teamwork and Expertise

The project’s success stems from the skills, precision, and dedication of the Thinh Phong team. From site survey, cable routing, device installation, to system configuration, each step was executed with meticulous care to meet strict technical standards and safety requirements.

“Every project is a matter of professional honor.”
This guiding principle reflects the team’s approach to every task and ensures a consistently high-quality outcome.


Logistics and Support

Reliable logistics played a critical role in maintaining the project schedule. The support team ensured timely delivery of materials, pre-checked equipment, and facilitated smooth on-site operations, allowing technicians to focus entirely on their specialized tasks.


Leadership and Motivation

The involvement of Director Pham Hoang Hanh Nhan provided guidance, resolved technical challenges, and motivated the team. His oversight ensured the project met its deadlines, adhered to standards, and delivered optimal energy solutions to the client.


Conclusion

The 11.6 kW hybrid solar system in Binh My, Cu Chi stands as a clear testament to:

  • Thinh Phong’s technical expertise

  • Seamless collaboration across departments

  • Dedication and professionalism of the team

  • Visionary leadership guiding project success

This project exemplifies a well-executed, efficient, and sustainable energy solution, delivering long-term value and reliability to the customer.