1. Project Overview
On June 29, 2020, Thinh Phong MCT successfully completed and commissioned a 100 kW rooftop solar power system for Mr. Binh in Tay Ninh Province.
This project reinforces the company’s commitment to delivering high-quality, safe, and sustainable clean-energy solutions while contributing to the growing adoption of renewable power in Vietnam.

2. Technical Specifications & Scope of Work
-
Installed Capacity: 100 kW
-
Client: Mr. Binh
-
Location: Tay Ninh Province
-
Commissioning Date: June 29, 2020
-
Scope of Work:
-
Site survey & engineering design
-
Installation of mounting structures, solar modules, and inverter
-
DC/AC electrical installation
-
System testing & final commissioning
-

3. Professional Installation Process
3.1 Site Survey & Engineering Analysis
The technical team conducted a detailed on-site assessment, evaluating sun exposure, roof conditions, tilt angle, load capacity, and safety factors. Based on the findings, an optimized system design was developed to ensure maximum performance.

3.2 Mounting Structure & Module Installation
Structural frames were installed in accordance with mechanical and safety standards. Solar panels were mounted precisely to ensure durability, weather resistance, and high energy conversion efficiency.
3.3 DC/AC Cabling & Inverter Installation
All DC and AC wiring was executed according to manufacturer guidelines and electrical safety standards. The inverter and protection devices were configured and tested to guarantee stable and reliable system operation.

3.4 System Testing, Verification & Commissioning
Before handover, the system underwent full electrical testing, including voltage/current checks, inverter diagnostics, grounding inspection, surge protection verification, and real-load performance testing. The project was then officially commissioned and handed over to the client.
4. System Benefits to the Client
The 100 kW solar system delivers:
-
12,000–14,000 kWh of monthly power generation, depending on seasonal irradiation.
-
Significant cost savings, reducing monthly electricity expenses by VND 30–40 million.
-
High long-term investment value with a fast payback period.
-
Reduced CO₂ emissions, contributing to environmental sustainability and relieving pressure on the national grid.
5. Commitment from Thinh Phong MCT
Thinh Phong MCT sincerely thanks Mr. Binh for placing his trust in our services and solutions. We are committed to providing long-term technical support, maintenance, and performance monitoring to ensure the system operates safely and at optimal efficiency throughout its lifetime.